OS preview: explore the Home, Pit, and Spread loop with sample workspace data.
Calendar

Plan

Pulse

5 time blocks

Review

3 approval gates

Loose

2 need a slot

Mon09:00

Design pass

Design review · 10:30

70%

Check row density, timeline scale, and text clipping.

Tue11:00

OS surfaces

Approval · 13:00

45%

Commit only the card and phase structure that survived review.

Wed13:30

Archive flow

Build · 16:20

30%

Turn placeholder pages into useful working surfaces.

Thu15:00

Decision room

Design review · 10:30

55%

Check row density, timeline scale, and text clipping.

Fri17:00

Quality pass

Approval · 13:00

20%

Commit only the card and phase structure that survived review.

Review

Balance pass for Spread

10:30

Check row density, timeline scale, and text clipping.

Design review

Pit draft acceptance

13:00

Commit only the card and phase structure that survived review.

Approval

Weekly schedule

Mon70%

Design pass

Spread and topbar

Tue45%

OS surfaces

Plan, Cards, Library

Wed30%

Archive flow

Outputs and reuse

Thu55%

Decision room

Card review

Fri20%

Quality pass

Errors and copy

Unscheduled queue

Balance pass for Spread

10:30

Check row density, timeline scale, and text clipping.

Design review

Pit draft acceptance

13:00

Commit only the card and phase structure that survived review.

Approval

Plan next OS menus

16:20

Turn placeholder pages into useful working surfaces.

Build

Planning rules

Keep Plan distinct from Spread

Plan owns committed execution time; Spread owns long-range structure.

RuleProduct

OS shortcuts